Running-in period is to guarantee the normal operation of construction machinery
to lessen the service existence of part one. But at the moment how to
do punch quilting, quite a few users due to the insufficient understanding
or using construction machinery is a result of tight time, or wish to gain, and
disregard the run-in duration of the brand new machine would be to recruit.
Quite a few users think when the makers possess a warranty period, this machine
is repaired through the manufacturer to interrupt, therefore the punch machine
manufacturers within the run-time machine is because Shao lengthy-term load,
causing early frequent attack machine, that does not only affects the standard
utilisation of the machine , Shorten the existence from the machine, but
additionally since the machine is broken, the outcome around the progress.
Therefore, the utilization and protection of construction machinery functioning
should cause enough attention. ? First, the options of run-in period:
1, put
on rate fast ? Because of the new machine parts processing, installation and
adjustment of things like the impact of the conflict, the top of cooperation is
extremely small, pressure at first glance isn't small. The device during
operation, a part of the top of concave and convex a few of the conflict, put on
lower the metal fragments, but additionally as abrasives, still have fun playing
the conflict, the greater rapid area of the cooperation in the look of
deterioration. Therefore, the put on rate (particularly, the co-operative
surface) put on during operation of easy components. At the moment, think that
overload operation, it'll damage the website, the first problems.
2, smooth ?
Because the gap from the new installing of spares punch
university rawalakot azad kashmir, press manufacturers due to installation
along with other reasons, it is not easy to make sure uniform gap, smooth oil
(grease) is difficult to create a uniform top of the oil film to avoid the
conflict of deterioration. After which decreased the graceful performance of the
area of the early abnormal put on. Serious, will constitute a great cooperation
top of the conflict or even the emergence of bite, resulting in attacks.
3,
attack loose ? Area of the new processing and installation by means of some
mistakes, previously using punch, because of the impact of shock, vibration
along with other alternative load, and also heat, deformation along with other
factors, punch manufacturers with excessive deterioration , Simple to help make
the original fasteners loose.
4, attack leak phenomenon ? Because of the
impact of mechanical loosening, vibration machine heating machine, sealing
surface and pipe joints can look leakage phenomenon casting, processing along
with other shortcomings, it is not easy to set up and debug the creation,
speculate of oscillation punch
vineyards, affecting the job process, reveals this Disadvantages are
(leakage) of oil leakage (water). Therefore, the run-in period really is easy,
there leakage.
5, operational errors and much more ? Because of the layout
from the aircraft, (particularly the new operator) don't realize the part,
because of operational problems, or perhaps cause mechanical failure.
没有评论:
发表评论